Drilling Fluids Engineer | Drilling Fluids Engineer

Familiar Technologies: WBM(water base mud),

Polymer mud (with kcl inhibitor)

OBM(oil base mud with different density 1.25sg,2.02sg,2.04sg,2.05sg,2.06sg,1.45sg,less than 1.00sg)

Regions of the world you have worked: Developement field in H.M.D hassi messaoud-Algeria.

Resume: WORK EXPERIENCE

Aug 2007 – Present BASP-HALLIBURTON H.M.D, Algeria

MUD ENGINEER

FIELD SERVICE RERESENTATVE / FSR1(MUD ENGINEER):

Experience which can made evidence of competencies:

DATE RIG WELL NAME CUSTOMER FIELD

FEB-2011 NABORS/F22 MD#640 SONATRACH HASSI MESSAOUD

DEC-2010 NABORS/F22 OMGZ#802 SONATRACH HASSI MESSAOUD

OCT-2010 TP#169 OMKZ#822 SONATRACH HASSI MESSAOUD

SEP-2010 NABORS/F22 OMJZ#735 SONATRACH HASSI MESSAOUD

AUG-2010 NABORS/F22 MDZ#631 SONATRACH HASSI MESSAOUD

JUIN-2010 NABORS/F22 ONI#541 SONATRACH HASSI MESSAOUD

MAY-2010 NABORS/F22 MDZ#635 SONATRACH HASSI MESSAOUD

FEB-2010 NABORS/F22 OMJ#601 SONATRACH HASSI MESSAOUD

DEC-2009 NABORS/F22 OMJ#442 SONATRACH HASSI MESSAOUD

OCT-2009 NABORS/F22 OMKZ#602 SONATRACH HASSI MESSAOUD

SEP-2009 NABORS/F22 MDZ#434 SONATRACH HASSI MESSAOUD

AUG-2009 NABORS/F22 MD#640 SONATRACH HASSI MESSAOUD

JUI-2009 NABORS/F22 ONM#501 SONATRACH HASSI MESSAOUD

FEB-2009 NABORS/F22 MDZ#605 SONATRACH HASSI MESSAOUD

DEC-2008 NABORS/F22 OMKZ#331 SONATRACH HASSI MESSAOUD

OCT-2008 NABORS/F22 MD#640 SONATRACH HASSI MESSAOUD

SEP-2008 NABORS/F22 MD#640 SONATRACH HASSI MESSAOUD

Details of duties related to my job experience:

.Control of drilling fluid parameters for optimized well drilling

.Control and becarful of any sign of kick or eruption on mud tanks

.Preventive measure for down hole complications

.Treatment & remove of Stuck up, mud losses & activities

.Preparation of well completion report, cost analysis & measure to optimize the cost in

next wells.

.Compliance of HSE requirements

.Preparation of Scope of work, negotiation with service provider.

.Contract Management – Execution, monitoring & reporting.

.Calling warehouse with anticipation as need as possible for supply of products to be used,

.Pretermined Concentrations of those products and fluid specifications at different depths

.Making sure that the new mud to be added is made up to the required specifications.

.Design The chemical composition of the mud as to stabilize the hole.

.Make regular physical and chemical checks on the drilling mud.

.Specify additives to correct changes occure on mud properties,

.Been prepared if the geologists’ predictions are not entirely correct, or if other problems

arise.

.Assistance and following is part of my job while cementing casings,also while

performing DST test, and other special operations as:

*Squeeze cement plug.

*Pumping sand plugs.,