Experienced Mud Engineer | Experienced Mud Engineer

Familiar Technologies: Most drilling fluids systems up to 19.5ppg o.nshore and offshore:worldwide

25yrs experience up to fluids supervisor position

Regions of the world you have worked: Noth Sea

Europe

Middle East

N Africa

W Africa

SE Asua

Venezuela

Australia

Resume: MUD ENGINEER/FLUIDS SUPERVISOR

Chris Spilsbury

Nationality: British Date of Birth:26.04.54

EDUCATION:

Degree: Bsc Combined Science

Open University Environmental Control and Public Health

Open University Environmental Monitoring and Control

Dec 81 – Jan 82 Mud School Baroid Houston

EMPLOYMENT HISTORY:

Feb 80 – Nov 81 Mud logger in Libya w/Baroid

Dec 81 – Jan 82 Mud School Baroid Houston

Jan 82 – Apr 84 Mud engineer Libyan Baroid Oasis Oil/Occidental/Mobil/Libyan National Oil Compny

Managed 3 wells of 14000ft on land when no chemicals were available. It involved salvaging chemicals from old rig sites

Jul 84 – Jul 86 Mud engineer in Nsea w/Magcobar

Initiated the first zero discharge wells for Phillips Petroleum in the N Sea.

Dec 86 – Apr88 Electrical products Salesman w/3M

Apr 88 – Mar90 Mud engineer N Sea w/MI

Apr 90 – Nov 92 Senior Mud engineerN Sea w/Baroid

Conoco/ Hamilton/ENI/ELF/BP

Nov 92 – Mar 94 Senior Mud engineer Nigeria w/Baroid/Mobil

Ran and mixed PHPA mud on semi sub in Nigeria during oil strike

Mar 94 – Sept 95 Senior Mud engineer Egypt w/Baroid/AGIP

Managed Diesel based mud and cuttings shipment from jack up in the Nile Delta region

Sept 95- May 96 Consulting ELF/ARCO/AGIP

Mud engineered HP/HT wells with 19.4ppg Low toxic oil based mud

June 96 Consulting/Chevron Namibia

Aug 96- Nov 96 Consulting Phillips SN Sea

Jan 97- June 97 Consulting Baroid /Oryx

June 97- Dec97 Consulting Baroid /Arco SN Sea

Jan 98- June 98 Consulting Enterprise Oil /Pierce field

Development.

Batch drilled wells for Enterprise oil/Pierce development (as seen on BBC TV)

July 98 – Sept 98 Consulting Falklands Islands/Desire/Shell/MI

Oct 98 – Nov 99 Consulting MI Azerbaijan for AIOC/BP

Jan 00 – Nov 01 Consulting N Sea Shell / BP

Jan 01 – Aug 02 Consulting For Baroid/Ameriven/PDVSA in Venezuela

Engineered and modified Mud program for batch drilling 20 wells on multiple pad locations in Venezuela. This involved spud to slotted liner, through 1000ft+ of unconsolidated heavy oil sands. All cuttings being removed /managed for land fill disposal. First oil being achieved 10 weeks after start-up with 50 % more oil production over target being recovered.

Sept 01- Sept 02 Consulting for Nelson platform /Enterprise Oil/MI

Drilling of extended reach wells on Nelson Platform. Cuttings being reinjected and judicious fluid management during drilling and clean up.

Oct 02 – Feb 03 Consulting for Kavala Oil Greece (H2S)/MI

HT and H2S Wells water based fluids in Greece and Croatia.Recommended BOPS fully tested after milling.

Mar03 – May 03 Consulting for Ena/Crosco Croatia (Hi temp)/MI

July03- Aug 03 Consulting for Petro Canada/MI

Oct03- Oct 04 Consulting for POGO/MI Hungary

Mud engineering with waste management on land. Operating centrifuges and waste management direction using Kcl/glycol in sensitive groundwater area. i.e doing mud engineers job + centrifuge engineers job

Nov 04 –Dec 04 Consulting for Santos /MI Indonesia

Feb 05 – Mar 05 Consulting MI/ Hunt Oil Yemen

Batch drilled 4 wells in desert with Diesel Mud- 3 rig moves

April 05 Consulting MI/Unocal Thailand

Batch drilled 7wells

May –June 05 Consulting MI/Apache Oil Australia

July 05 – Mar 06 Mud supervisor for Reliance Oil India

April 06 – July06 Consulting Soco Tunisia

Aug 06 Sept 06 Consulting BHI /Woodside Mauritania

Oct 06 – Jan 07 Consulting MI Tunisia B Gas/SOCO/AGIP

Feb 07 – Sept 07 Consulting Baroid /Marathon North Sea

Oct 07 – Jan08 Consulting Baroid /Wingas Onshore UK

Jan 08 – Mar 08 Consulting Baroid /BG North Sea

Mar 08 – Apri l08 Consulting Baroid /Wingas Onshore UK

June –July 08 Consulting Baroid/ Chevron Thailand

Aug – Sept 08 Consulting Apache Oil UK

Oct –Dec 08 Consulting Total/MI UK

Jan – April 09 Consulting BP/MI Azerbaijan

July- August 09 Consulting BG Tunisia Office

September 09 Consulting Aberdeen BG Office

Nov 09 – Nov 10 Consulting BG Tunisia Office

Mud systems:

Pac’s

Gyp Lignosulphonate

Cationic

Salt Saturated/Bentonite/saltwater gel

Silicates

Kcl

Kcl/Glycol

Workover/Completion Fluids (many)

Ultradrill

PHPA

Oil based muds: Synthetic/Diesel,Low toxic: 50/50 –90/10

H2s treated muds

Drill in/High temp Fluid

Milling Fluid

Drilling Problems:Encountered

High Pressure/High Temperature

H2S wells

High angle/Extended reach wells

SN Sea Zechstein Platten Dolomite

Mud wts to 19.4ppg

Lost circulation (Many types)

Kick control

Differential Sticking minimisation

Low pressure/Heavy oil sands

Cuttings disposal/reinjection

Water Based Mud engineering and operation of Centrifuges + waste management at the same time.

Mud cap drilling

Multi well batch drilling

High 6rpm rheology in 22in hole

About myself:

I like most sports: Golf, cricket (both of which I still play) rugby and football.

My present job has just finished with BG Tunisia handling 2 rigs as a drilling fluids supervisor. I have been involved in the day to day running of the fluids and cuttings waste disposal operation. I saved $2.0million from the existing operations before a fluids advisor was put in place.

This involved introduction of a new drilling fluid previously decided before being hired on.The system was then successfully reengineered such that the cost /bbl was reduced by half.Further cost reductions would have been implemented had further drilling been performed further reducing cost by another half.

Performed study of solids control systems employed which were partly implemented, reducing with the mud system the NPT to produce top quartile wells.

Greatly reduced waste disposal costs by attention to detail and by recovery of expensive fluids waste.

Negotiated lowered storage costs for fluids